Solar Panel Removal & Refit in Manchester

Solar panels removed for roofing work and refitted properly, with the array tested and documented afterwards.

Certified, registered and independently checked

Solar panels usually come off because of the roof, not because of the panels. A re-roof, a roof repair, a dormer, a chimney, a flat roof replacement or storm damage can all mean the array has to come off before the roofing team can get at the covering, then go back on once the roof is sound again.

We remove and refit solar arrays across Greater Manchester and further afield. Ashley is an MCS-certified installer and a NAPIT-registered electrician, so the DC side, the isolation, the testing and the paperwork are handled by the same person who does the roof work coordination.

When panels need to come off

The common reasons we see are:

  • A full re-roof, whether that is slate, tile or a flat roof covering
  • A roof repair around a chimney, valley, flashing or damaged section
  • A dormer, loft conversion or extension that changes the roof layout
  • A flat roof replacement where the mounting rails have to come up with the covering
  • Storm damage or a failed fixing that needs the array lifted to put it right
  • A roof that has reached the end of its life and is being replaced before the panels go back on

Removing panels is not a case of undoing a few brackets. The array has to be isolated safely on the DC side as well as the AC side, the panels have to be handled and stored without damage, and the roof has to be left watertight while the roofing work happens.

How the job runs

Ashley surveys the array and the roof first. That means looking at the mounting system, the age and condition of the panels, the cabling and isolators, the roof covering, and how your roofer plans to work. Scaffolding and access are agreed before anything comes off.

The sequence is planned with you and the roofing team: what comes off, what can be reused, which fixings and flashings need replacing, where the panels are stored, and when the roofers need the roof clear. On the day, the DC and AC sides are isolated and labelled, the panels and rails come off, and the roof is left protected.

The roofers then do their work. Ashley works around their programme and checks the mounting points, flashings and cable route while the roof is open, because that is the point where a problem is easy to put right and expensive to discover later.

When the roof is ready, the array goes back on with new fixings or flashings where they are needed. The cabling is reconnected, the earthing is checked, and the system is tested and recommissioned: string tests, insulation resistance, earth continuity, inverter start-up and monitoring. The paperwork is updated before handover.

Working with your roofer

We have worked with the same roofing firm for years, and we have also worked alongside roofing teams we had not met before. On one Checkatrade job, the customer had already hired a roofing team, and the review noted that Renegade had not worked with them before. Ashley surveyed the job, priced it, worked with the roofers on the sequence and completed the removal and refit. The customer said the quote was half what other trades had quoted.

That is the useful part of having an electrician coordinate the solar side rather than a roofing firm doing it as an afterthought. The roofers know the roof; Ashley knows the array, the isolators, the inverter and what the system needs before it can be switched back on.

What happens to the panels

The panels are checked before they go back on. If they are sound, they are reused. If a panel is cracked, delaminated or failing, it gets replaced rather than refitted and forgotten about. We will tell you before the job what can be reused and what cannot, and if a replacement panel is needed we check whether a compatible one is available.

If the panels themselves have failed, that is a different job from a removal and refit. We can replace failed panels and check the rest of the array at the same time, which is what happened on a job where three panels had failed and the customer wanted the system put right rather than patched up.

Will the system still be certified?

The refit is tested and documented, including the array, the cabling and the earthing. Where the original system was MCS-certified, we keep the paperwork in order and provide the test results. If you claim export payments under the Smart Export Guarantee, check with your supplier that they have the updated details after the work.

The system also has to be safe to switch back on. That is why the testing and recommissioning are part of the job rather than an optional extra. A roof that looks finished is not the same as an array that has been tested and is ready to generate again.

What it costs

There is no fixed price. The job depends on the size of the array, the roof access and scaffolding, the condition of the mounting rails and fixings, whether the roofers or we provide the scaffold, how many visits the roof programme needs, and whether any panels or parts have to be replaced.

Ashley surveys the property and gives you a written quote with the scope set out. If the roofers find something unexpected once the covering is off, you get told before any extra work is done.

“From the start he was extremely friendly, knew what he was talking about and we agreed a price, he came did the job it took longer than he expected but he didn't complain he took his time to finish the job and came back next day to help set it up, I was thoroughly impressed”
10/10 · M45 · March 2026 · one of 172 verified reviews from Checkatrade

What customers say

"needed solar panels removed for new roof. very professional, quick and accommodating."

That is a Checkatrade review from an M7 customer, dated 14 October 2026.

"We needed the Solar Panels removing and refitting to allow roofers to replace roof. I Posted on CHECKATRADE and received a call from a very kowledgeable gentleman From RENEGADE ELECTRIC. He said he would need to see the job to enable him to work out a job plan and price. The job required working with a team RENEGADE hadnt met before. He came the next day and spent quite some time looking at the job. He left promising to call that pm with a price. RENEGADES was half of quotes from other trades had been. RENÈGADES work rate, ethic and quality. Were excellent."

That one is from an M29 customer in January 2024.

On a recent job in Glossop, the solar went on alongside a complete re-roof rather than coming off an existing array. The customer wanted the panels fitted at the right point in the roofing sequence so everyone could use the scaffolding while it was up. Ashley worked with the roofing team, and the finished system was an 18-panel array with an 8kW hybrid inverter and 19.2kWh of battery storage. It is a different starting point from a removal and refit, but the sequencing lesson is the same: the roof and the solar have to be planned as one job.

Where we work

We cover Greater Manchester from Prestwich. There are dedicated local pages for Altrincham, Bury, Middleton, Prestwich, Trafford, and Whitefield. We also travel further afield for roof work, including the Glossop job above. If you are outside those areas, ask and we will tell you whether we can get to you.

The main solar and battery installation page covers the full installation process, and the flat roof page covers arrays on garages, extensions and flat roofs.

Get in touch to book a survey for solar panel removal and refit, or to talk through a roof project that needs the array taken off.

How it works

How a solar panel removal and refit runs

The panels come off for the roof, then go back on and get tested.

  1. Survey

    Ashley looks at the array, the mounting system, the roof covering, the cabling and isolators, and the roofer's programme. Scaffolding and access are agreed before anyone starts taking panels off.

  2. Plan the sequence

    What comes off, what can be reused, which fixings and flashings need replacing, how the panels are stored and when the roofers need the roof clear. The sequence is agreed with you and the roofing team.

  3. Safe isolation and removal

    The DC and AC sides are isolated and labelled before the panels and rails come off. The roof is left protected and the array is stored safely while the roofing work happens.

  4. Roof work

    Your roofers carry out the re-roof or repair. Ashley works around their programme and checks the mounting points, flashings and cable route while the roof is open.

  5. Refit

    The array goes back on with new fixings or flashings where they are needed, the cabling is reconnected and the earthing is checked. If a panel was damaged, it gets replaced rather than put back.

  6. Test and recommission

    String tests, insulation resistance and earth continuity are checked, the inverter is restarted, monitoring is confirmed and the paperwork is updated before handover.

Recent work

Jobs we have actually done

Real jobs in Greater Manchester, photographed on the day. Scroll sideways for more.

See the full gallery

Common questions

The questions we get asked most

Why would solar panels need removing?

Usually because the roof underneath needs work: a re-roof, a roof repair, a dormer, a chimney, a flat roof replacement or storm damage. Sometimes an extension or loft conversion changes the roof layout and the array has to come off to suit.

Can the existing panels be reused?

Usually, if they are undamaged and still within their working life. Each panel is checked before it goes back on, and any that are cracked, delaminated or failing get replaced rather than refitted. We will tell you before the job what can be reused and what cannot.

How long are the panels off the roof?

Removal and refit are usually a day or two each, but the gap between them is set by the roofing programme. The roofers need the roof clear while they work, so the panels stay off until the covering is ready to take them again.

Do you work with my roofer?

Yes. We have worked with the same roofing firm for years, and we have also worked alongside roofing teams we had not met before. The sequence, scaffolding and access get agreed before the panels come off so nobody is waiting on the other trade.

Will the system still be certified after a refit?

The refit is tested and documented, including the array, the cabling and the earthing. Where the original system was MCS-certified, we keep the paperwork in order and provide the test results. If you claim export payments, check with your supplier that they have the updated details.

Do you need scaffolding to remove and refit panels?

Usually, yes. If your roofer already has scaffolding up for the roof work, that is often the sensible time to do the removal and refit. Where there is no scaffold, we arrange access as part of the job.

Can you replace failed panels at the same time?

Yes, if the replacement panel matches or is compatible with the rest of the array. If a panel has failed, we will check whether a like-for-like replacement is available before recommending a bigger change.

Ask us something else

Want a price for your property?

A free survey, a system designed for your actual roof and usage, and a written proposal with the numbers behind it.

Tell us about the property

Send a message and we'll come back to you within 24 hours, one way or the other. If it's easier, ring Ashley directly.

  • A qualified electrician does the survey, not a salesperson
  • Free survey and a written proposal with the numbers behind it
  • We reply within 24 hours, one way or the other
  • No commission, no pressure, no call centre

9.96/10 from 172 verified reviews · MCS NAP-66870 · all our accreditations

Photo Gallery